PRE ENGINEERED STRUCTURES DESIGN

Authors

  • Abhishek Tiwari, M.Tech. (Structural Engineering), Svnu, Sagar (MP)

Keywords:

Industry, pre engineered building, Arsenic & Terzaghi’s equation.

Abstract

Once the industry started to offer custom-designed metal buildings to fill the particular needs of each client, the name pre-engineered building became somewhat of a misnomer. In addition, this term was uncomfortably close to, and easily confused with, the unsophisticated prefabricated buildings, with which the new industry did not want to be associated. Despite the fact that the term pre-engineered buildings is still widely used, and will be often found even in this book, the industry now prefers to call its product metal building systems.

References

• Bundy, B. and Schrock., S.D., 2007. Modification of Driver Behavior Based on Information from Pedestrian Countdown Timers. In: Proceedings of the 2007 Mid-Continent Transportation Research Symposium; Ames, Iowa.

• Classen, S., Shechtman, O., Stephens, B., Davis, E., Justiss, M., Bendixen, R., Belchior, P., Sandhu, M., Posse, C., McCarthy, D., Mann, W., 2007. The impact of roadway intersection design on driving performance of young and senior adults. Traffic Injury Prevention 8 (1), 69-77.

• Elmitiny, N., Yan, X., Radwan, E., Russo, C., Nashar, D., 2010. Classification analysis of driver's stop/go decision and red-light running violation. Accident Analysis & Prevention 42 (1), 101-111.

Downloads

Published

2015-12-31